Still left: In the VAB, the crawler transporter positions by itself below Mobile Launcher one in preparation for rollout of SA-501 on the start pad – Notice the worker in the foreground for sizing comparison.The new design Heart contains structure, verification, and validation engineering groups that can concentrate on the long run design of Loca